Learning the hard way...

Over the past two projects, every time I’ve realized I made a mistake, I’ve made a note to myself. (“Lessons Learned”, in business jargon.) Here’s a collection. (Yes, some of these are “well, duh” statements - they’re here to document situations that I let business inertia drag me into.)

-Check project management resources for frequently missed items in estimating project timeline. -Be sure to to document user classes and areas of interface they must be allowed to access/denied access to. -Release Management/Operations needs to know when daemons actually terminate if they don’t die right away. -Set up one of every type of network connection on localhost for dev (and other environments), so you can test functionality that uses these protocols. -Structure modules/methods in such a way that they can be easily unit tested! -Support all options for a protocol in your config files, not just those you initially plan to use. -Document default values for all configuration options, reasons behind them. -Ensure systems administration and database administration are on signoff list for technical design, so they can raise security/efficiency issues. -Never use any unencrypted protocol, even within an intranet; other departments are likely to block it. -Estimate time up front to build unit/integration test harnesses, builder/installer for all environments. -Project managers always assume developers will be allocated 100%, when in fact it is more like 80%. -Note all servers for project and types of connections made by application, then request setup from Systems Administration prior to beginning coding! -Plan around reloading config before accessing each option, so changes can be made without shutting down. -Use one config hierarchy for everything, so you don’t have to manage multiple files. -Allocate time for TDD revisions, as other departments review it for the first time. -Calculate expected load on networks, databases, etc. in advance. -Ensure vendors fully understand all requirements (and their difficulty) before signing any work agreements. -Don’t accept specifications that are vague or open to interpretation, as requester is likely to reject finished product. -Write down all figures you give to others in meetings for later reference (such as effort estimates). -Skimping on code reviews costs almost as much time as it saves, and may result in a lower-quality product. -Monitoring tools must raise alarm if items in processing queue get too old. -Manual installation of files not advisable. Consider making RPM. -Specify precise file locations and names for each module in technical design. -Maintain separate config directories for development, testing, production! -Ensure all generic accounts (FTP, database, etc.) are created well before rollout! -Specify whether paths will be absolute or relative. -Use ‘set’ as a verb in method names rather than ‘add’, unless you intend it to fail if the value already exists. -Perl is a poor language for outsourcing. -Perl is a poor language for building large applications.

comments powered by Disqus